The prompts and sticking points you run into most often in the admin console, listed by symptom with what to check first.

Applies to: Admin console, live version of 2026-10-27Updated 2026-10-28

Building processes and submitting for training ​

SymptomWhat to check first
Clicking "AI 提取步骤" (AI extract steps) shows "需要作业指导书作参考" (Work instructions needed as reference)First click 提取作业指导书 (Extract work instructions) to generate one. The teaching video has already been uploaded; you don't need to upload it again. See Materials
Submit for review is blocked with "…用了零件检测规则,但工序还没有模型" (…uses part detection rules, but the operation has no model yet)Follow the checklist: if it has never been trained, click 去送训 (Go to training); if it has been trained, click 选用 vN (Use vN). See Fill in operation basics
Submit for review is blocked with "…步骤都还没配检测规则" (…no steps have detection rules yet) or "…还没有教学视频" (…no teaching video yet)Click the checklist item to jump to ⑤ or ② and fill it in
Submitting for training shows "工序未配置检测类别" (The operation has no detection classes)First add classes in ③ Model & classes. See Set up the model and classes
Submitting for training shows "该租户训练对接未启用…" (Training integration is not enabled for this tenant…)Your company does not have the training platform enabled. Contact your HEMI account manager
A model was released but the workstation did not switch① Is the training version still at test version? ② Has the SOP process not been approved yet? ③ On the workstation's training page, do the two checksum rows say "一致" (Match)? If not, tap 同步到本机 (Sync to device)
"训练采样" (Training Sampling) is missing on the workstationYour company does not have the training platform enabled. Contact your HEMI account manager

Process status ​

SymptomWhat to check first
A released process can't be editedThis is normal. First click 退回草稿 (Return to draft). See Change a released process
An SOP process under review can be neither edited nor deletedThis is normal. First settle it on the review page. See Submit and review a process
An approved SOP process can't be deletedThis is normal. If you no longer need it, click 停用 (Disable). See Manage released processes

Lines, scheduling and devices ​

SymptomWhat to check first
When scheduling, a station shows "未绑设备,不能排" (No device bound, cannot schedule)Go to line management and click 捆绑设备 (Bind device). See Maintain lines and stations
The workstation doesn't receive the schedule, or pause has no effect① Is a device bound to the station? ② Wait for the next heartbeat, 30 to 60 seconds; ③ If the workstation is offline, it catches up once it is back online
Changing the number of stations on a line gives an error saying you must remove links firstThe line has schedules, process assignments or bound devices. This block is on purpose. Changing only the name or prefix does not trigger it
The device list shows offlineNo heartbeat for 5 minutes: check that the workstation is powered on and connected to the network
A menu is missingThe role has not been granted it, or the parent menu was not checked too. See Understand what each account can see

Other resources ​

To learn aboutGo to
Frame extraction, labeling and review, training, releasing modelsTraining platform
Workers' production work, handling alarms, recording footageWorkstation
How to define classes and choose rulesHow to choose a type, Notes and pitfalls