Skip to content

Screenshots show the Chinese interface. The workstation can be switched to English in Settings, and the button names here match the English interface.

Do the pre-shift check ​

Before each shift, spend half a minute checking that the job is right, the network works, and the camera and bins are in place.

Applies to: Workstation stable release (UI 1.6.59)Updated 2026-10-28

In short

  1. Start work only when the production line, station, product, work order and operation in the header match the job your team leader gave you.
  2. The camera view is clear and not blocked, and the bins, parts and fixtures are in their usual places.

What to check ​

ItemHow to check
Are the production line, station, product, work order and operation in the header right?Compare them with the job your team leader gave you. If they do not match, do not start yet; press Sync in the header. If they still do not match, ask your team leader
NetworkGreen "Online" at the top right. You can still work without the network; records are uploaded automatically once it is back
Camera viewThe picture is clear, nothing is blocking it, and the parts and bins are all in view
Bins, parts, fixturesIn their usual places
Tower lightAll off when idle; green means producing, yellow means standby

Do not move the bins, parts or fixtures

The machine learned them in their usual places. Moving them easily causes false alarms.